Project: Bovine-RV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Jeff Lawson   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:601.5
Total Flight Time:
Start/Last Date:Jan 28, 2022 - No Finish Date
Engine:Lycoming YIO-390-EXP119 non-cert
Propeller:Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:Dynon Skyview
 
Friendly URL: https://eaabuilderslog.org?s=Bovine-RV14A

Home or Last Project Picture

Jun 14, 2023     Vertical stab scuffing and priming - (2.5 hours)       Category: Tail Feathers
I started the session by doing some final dimpling and machine countersinking of the spar doublers of the vertical stabilizer. This required some careful reading and research since I wanted to be sure that I was doing these operations on the correct side. The VS skin and the flanges of the ribs also required dimpling of its surface for flush rivets, which I used either the hand squeezer, the DRDT2 table dimpler, or the close-quarters pop rivet dimpler as appropriate.

Next was to finish scuffing all of the surfaces with Scotch-Brite pads, wipe down the parts with acetone, and then spray a coat of self-etching primer on them.

What's next? Cleco all of these parts back together and start riveting them.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.